STOP PAYING FOR WELLHEAD SPILLS.
One environmental spill can cost $12,000-$90,000+ (or more) between vacuum truck + soil disposal, insurance deductible, AER fines, admin time, and lost production.


Precision-engineered for every wellhead configuration. Trusted by 80+ North American producers since 2012.
Precision-engineered for every wellhead configuration. Trusted by 80+ North American producers since 2012.
One environmental spill can cost $12,000-$90,000+ (or more) between vacuum truck + soil disposal, insurance deductible, AER fines, admin time, and lost production.
Vacuum truck + soil disposal ($8,000+)
Insurance deductible ($25k-$50k)
AER fine + admin time ($5k-$25k)
Lost production + labour ($5k-$25k)
WSG unit — fraction of oil losses (One-Time Cost)
Install — no contractor needed (10 min)
Maintenance renewal (2 min)
Deploy quickly and safely with our innovative wellhead containment solution. Installs directly onto the stuffing box in just 10 minutes, requires no rig, and lets you reclaim valuable production time.
Our spill containment system captures all leaks at the wellhead and stuffing box, helping operators stay compliant, reduce administrative and insurance exposure, improve workforce efficiency by saving cleanup time, and protect the environment.
RISK 01 — INSURANCE
Insurers are tightening deductibles on wellhead spills — in many cases doubling them. Your deductible triggers before a single cleanup truck arrives. This is a risk management decision, not a product purchase.
$25,000–$50,000 per eventRISK 02 — REGULATORY
Every reportable spill means a release report, contamination assessment, remediation certificate, and potential enforcement action. Your HSE team spends days on paperwork instead of operations. WSG keeps spills off your reportable list entirely.
$5,000–$25,000 fines + weeks adminRISK 03 — CLEANUP COST
Every cleanup means a vacuum truck, soil excavation, transport to approved waste facilities, and multi-year remediation monitoring. Cash out the door with zero production value in return.
$8,000+ per cleanup call, minimumRISK 04 — LABOUR
The oilfield labour shortage is the defining challenge of this decade. Every hour an operator spends on spill cleanup is an hour they are not producing. WSG installs in 10 minutes by whoever is already on site.
$2,000–$8,000 diverted labour per eventOne uncontained spill costs more than protecting every well on your lease for a decade. This is arithmetic, not a sales pitch.
Costs you face every single time
One time. Lasts a decade.
Wellhead Containment Unit
Product Options
MODEL 1100
Rain Guard Top and
Bottom Includes Felt Wick
MODEL 1103
Felt Wicks Package of 10
for 1"-12" or 1-1/4" Polished Rod
MODEL 1101
Rain Guard Top Only -
Includes Felt Wick
MODEL 1102
Rain Guard Bottom Only
Polycarbonate Top
Basin Models
One uncontained spill costs $43,000–$98,000 before you're done. Vacuum trucks, AER fines, insurance deductibles, and field operators who should be producing oil — not cleaning it up.
Deploy quickly and safely with our innovative wellhead containment solution. Installs directly onto the stuffing box in just 10 minutes, requires no rig, and lets you reclaim valuable production time.
Our spill containment system captures all leaks at the wellhead and stuffing box, helping operators stay compliant, reduce administrative and insurance exposure, improve workforce efficiency by saving cleanup time, and protect the environment.
Insurers are tightening deductibles on wellhead spills — in many cases doubling them. Your deductible triggers before a single cleanup truck arrives. This is a risk management decision, not a product purchase.
Every reportable spill means a release report, contamination assessment, remediation certificate, and potential enforcement action. Your HSE team spends days on paperwork instead of operations. WSG keeps spills off your reportable list entirely.
Every cleanup means a vacuum truck, soil excavation, transport to approved waste facilities, and multi-year remediation monitoring. Cash out the door with zero production value in return.
The oilfield labour shortage is the defining challenge of this decade. Every hour an operator spends on spill cleanup is an hour they are not producing. WSG installs in 10 minutes by whoever is already on site.
One uncontained spill costs more than protecting every well on your lease for a decade. This is arithmetic, not a sales pitch.
WITHOUT WSG — ONE SPILL EVENT
Costs you face every single time
Vacuum truck + toxic soil disposal
$8,000+
Insurance deductible
$25K–$50K
AER fine + HSE admin burden
$5K–$25K
Lost production during cleanup
$3K–$15K
Field labour diverted from production
$2K–$8K
TOTAL — ONE EVENT
$43K–$98K+
WITH WSG — TOTAL INVESTMENT
One time. Lasts a decade.
WSG unit — custom fit, Canadian made
One-Time
Installation by your existing operator
10 min
Production downtime to install
Minimal
Maintenance removal time
2 min
Unit lifespan — proven since 2012
10+ yrs
TOTAL PER WELL
Fraction of 1 Spill






| Model | Production Tee | Outer (mm) | Outer (in) | Urethane Seal Color |
|---|---|---|---|---|
| 1959 | 2 3/8" | 89mm | 3.5" | Green |
| 1961 | 2 7/8" | 103mm | 4.1" | Black |
| 1962 | 3" | 114mm | 4.5" | Lime Green |
| 1963 | 3" | 119mm | 4.69" | Yellow |
| 1964 | 3" | 121mm | 4.76" | Dark Blue |
| 1958 | Non-standard | 87mm | 3.43" | Blue |
| 1971 | Non-standard | 92mm | 3.62" | Burgundy |
| 1972 | Non-standard | 96mm | 3.78" | Red |
| 1973 | Non-standard | 106mm | 4.17" | Orange |
| 1981 | Non-standard | 133.5mm | 5.26" | Light Blue |
No third-party service crews required. Well Site Guard is a 6-bolt sync designed to be installed by your current lease operators using standard tools.
Founded in 2007. Mass field deployment since 2012. From the Montney and Cardium in Alberta to the Permian Basin and Bakken in the US — the same units, still working.
Founded in 2007. Mass field deployment since 2012. From the Montney and Cardium in Alberta to the Permian Basin and Bakken in the US — the same units, still working.
We installed WSG across our Cardium lease in 2014. The reduction in AER paperwork, cleanup callouts, and field labour savings alone justified the investment within the first year.
Our pumpers used to spend hours every month on spill cleanup. Since WSG, that time goes back into production. In a tight labour market, that is not a small thing.
The 10-minute install was the deciding factor. Our previous units took a full crew and half a day per visit. WSG changed our maintenance economics completely.
We installed WSG across our Cardium lease in 2014. The reduction in AER paperwork, cleanup callouts, and field labour savings alone justified the investment within the first year.
Our pumpers used to spend hours every month on spill cleanup. Since WSG, that time goes back into production. In a tight labour market, that is not a small thing.
The 10-minute install was the deciding factor. Our previous units took a full crew and half a day per visit. WSG changed our maintenance economics completely.
We installed WSG across our Cardium lease in 2014. The reduction in AER paperwork, cleanup callouts, and field labour savings alone justified the investment within the first year.
ALBERTA CARDIUM PRODUCER · 200+ WELLS
Our pumpers used to spend hours every month on spill cleanup. Since WSG, that time goes back into production. In a tight labour market, that is not a small thing.
SASKATCHEWAN OPERATIONS SUPERINTENDENT
The 10-minute install was the deciding factor. Our previous units took a full crew and half a day per visit. WSG changed our maintenance economics completely.
PERMIAN BASIN HSE MANAGER · TEXAS















































































